Project Spotlight – Southern Jackson County Fire District Station 3
- Project: Southern Jackson County Fire District Station 3
- Application: Fire Station
- Product: TT-3 (3′ Tuff Trough washer drain trough)
- Lead Time: 4 business days
- Rep | Regional: Bulls-I Sales | Trent Sorenson
Background: An above-grade drain trough was needed for a new fire station being built in Jackson County, MO. The plumbing code required a drain trough with a minimum capacity of 18-gallons for (1) 65 lb. extractor. After recently meeting with the engineering firm that was awarded the project, the specifying engineer appreciated the features and benefits of the new Striem Tuff Trough.
Key Takeaway:
- This project was the contractors’ first Tuff Trough installation. They provided excellent feedback on the ease of installation and were blown away by the quick lead time.
Photos below: Completed installation